Customization: | Available |
---|---|
Operation Method: | Manual |
Frame Material: | Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Type | Size(L*W*H) | Material | Total Weight(kg) | Note | Package | |
PE300 | PVC610 | carton+iron pallet | ||||
2020C | 6.01*6.1*1.8m | arch pipe is 45*1.5mm,vertical tube is 45 x 1.5mm, | 190 | 210 | 4 legs,interval 2M | 96pcs/40GP |
2040C | 12.13*6.1*1.8m | arch pipe is 45*1.5mm,vertical tube is 45 x 1.5mm, | 350 | 386 | 7 legs, interval 2M | 64pcs/40GP |
3320C | 6*10*5m | arch pipe is 76*2.0mm, vertical tube is 60*1.5mm | 630kg | 670kg | 4 legs, interval 2M | 36pcs/40HQ |
3340C | 12.2*10*5m | arch pipe is 76*2.0mm, vertical tube is 60*1.5mm | 980kg | 1048kg | 7 legs, interval 2M | 24pcs/40HQ |
4040C | 12.19*12*4m | Girder tube: φ60×1.8 2. Longitudinal tube: φ60×1.5 3. Bracing tube: φ32×1.2 |
1483kg | 1560kg | 7 sets of leg Leg span: 2m |
12pcs/40HQ |
4640C | 12.19*14.92*5m | truss 60*1.8mm diagonal trace 25*1.2mm vertical pipe 60*1.5mm cloth-pulling pipe |
2000kg | 2090kg | 7*2 legs intercal 2M | 6pcs/40HQ |